Barge Canal Bridge 1st Terrace to Cornflower Dr

Segment 2 Sign
Currently Under Design

U.S. 19 from S.R. 580 to C.R. 95

Project Description

The project consists of removing the traffic signals on U.S. 19 at Republic Drive and Curlew Road. The signal at Curlew Road will be replaced with a new interchange.

The elimination of the signals in this project will result in uninterrupted traffic flow from 49th Street to Tampa Road in Pinellas County.

Motorists will still be able to have easy access to local businesses with the addition of frontage roads next to U.S. 19. An additional overpass which provides for U-turn movements on the frontage roads between S.R. 580 and Curlew Road will be provided near Northside Drive. Thru movements will be provided for northbound and southbound travel along the frontage roads across Curlew Road.

Anticipated Construction Start - TBD
Total Construction Costs - $76.6 Million

For further questions or concerns, please contact:

Sandra C. Gonzalez, PE
FDOT D7 - Project Management
11201 N McKinley Dr., MS 7-600
Tampa, FL 33612-6456
(813) 975-6164
Fax: (813) 975-6477

Email questions to
sandra.gonzalez@dot.state.fl.us


U.S. 19 Aerial Maps

Due to the size of this image it is best to download the image to your computer. To download the image, right mouse click on the image and choose Save Target As..., then save this PDF to your computer. If you need Adobe Acrobat Reader, click here to download for free.

Right mouse click to download.
Approximate download time per connection: 1 minute for T1, 2 minute for cable/DSL, and 20 minutes for 56k.

Click here to go back to Project Map.

Barge Canal Bridge 1st Terrace to Cornflower Dr